Yüklüyor......
Time-Lag and Cost Overrun of Infrastructural Investment with Special Reference to Power Projects in Kerala
Yazar: | Baby Thomas |
---|---|
Materyal Türü: | Printed Book |
Dil: | English |
Baskı/Yayın Bilgisi: |
Kochi
Dept of applied Economics, CUSAT
1994
|
Konular: |
Benzer Materyaller
-
Time-lag and cost overrun of infrastructural investments with special references to projects in Kerala
Yazar:: Baby Thomas,Guide- D.Rajasenan
Baskı/Yayın Bilgisi: (1994) -
Time and cost overruns of industrial projects in Kerala
Yazar:: Suresh, V. N.
Baskı/Yayın Bilgisi: (2000) -
Time and cost overruns of industrial projects in kerala.
Yazar:: Suresh, V.N
Baskı/Yayın Bilgisi: (2000) -
Project cost control for managers: An inside track to eliminating cost overruns
Yazar:: Tompkins, Bill G, et.al
Baskı/Yayın Bilgisi: (1991) -
FACTORS INFLUENCING TIME AND COST OVERRUNS ON CONSTRUCTION PROJECTS IN SOUTHERN PART OF INDIA
Yazar:: S. Binil Sundar
Baskı/Yayın Bilgisi: (2015)