Á lódáil...
Time-Lag and Cost Overrun of Infrastructural Investment with Special Reference to Power Projects in Kerala
Príomhúdar: | Baby Thomas |
---|---|
Formáid: | Printed Book |
Teanga: | English |
Foilsithe: |
Kochi
Dept of applied Economics, CUSAT
1994
|
Ábhair: |
Míreanna Comhchosúla
-
Time-lag and cost overrun of infrastructural investments with special references to projects in Kerala
le: Baby Thomas,Guide- D.Rajasenan
Foilsithe: (1994) -
Time and cost overruns of industrial projects in Kerala
le: Suresh, V. N.
Foilsithe: (2000) -
Time and cost overruns of industrial projects in kerala.
le: Suresh, V.N
Foilsithe: (2000) -
Project cost control for managers: An inside track to eliminating cost overruns
le: Tompkins, Bill G, et.al
Foilsithe: (1991) -
FACTORS INFLUENCING TIME AND COST OVERRUNS ON CONSTRUCTION PROJECTS IN SOUTHERN PART OF INDIA
le: S. Binil Sundar
Foilsithe: (2015)