Yüklüyor......
Time and cost overruns of industrial projects in kerala.
Yazar: | Suresh, V.N |
---|---|
Dil: | English |
Baskı/Yayın Bilgisi: |
Kochi
School of Management Studies
2000
|
Benzer Materyaller
-
Time and cost overruns of industrial projects in Kerala
Yazar:: Suresh, V. N.
Baskı/Yayın Bilgisi: (2000) -
Time-lag and cost overrun of infrastructural investments with special references to projects in Kerala
Yazar:: Baby Thomas,Guide- D.Rajasenan
Baskı/Yayın Bilgisi: (1994) -
Project cost control for managers: An inside track to eliminating cost overruns
Yazar:: Tompkins, Bill G, et.al
Baskı/Yayın Bilgisi: (1991) -
Time-Lag and Cost Overrun of Infrastructural Investment with Special Reference to Power Projects in Kerala
Yazar:: Baby Thomas
Baskı/Yayın Bilgisi: (1994) -
FACTORS INFLUENCING TIME AND COST OVERRUNS ON CONSTRUCTION PROJECTS IN SOUTHERN PART OF INDIA
Yazar:: S. Binil Sundar
Baskı/Yayın Bilgisi: (2015)