Загрузка...
Time and cost overruns of industrial projects in kerala.
Главный автор: | Suresh, V.N |
---|---|
Язык: | English |
Опубликовано: |
Kochi
School of Management Studies
2000
|
Схожие документы
-
Time and cost overruns of industrial projects in Kerala
по: Suresh, V. N.
Опубликовано: (2000) -
Time-lag and cost overrun of infrastructural investments with special references to projects in Kerala
по: Baby Thomas,Guide- D.Rajasenan
Опубликовано: (1994) -
Project cost control for managers: An inside track to eliminating cost overruns
по: Tompkins, Bill G, et.al
Опубликовано: (1991) -
Time-Lag and Cost Overrun of Infrastructural Investment with Special Reference to Power Projects in Kerala
по: Baby Thomas
Опубликовано: (1994) -
FACTORS INFLUENCING TIME AND COST OVERRUNS ON CONSTRUCTION PROJECTS IN SOUTHERN PART OF INDIA
по: S. Binil Sundar
Опубликовано: (2015)