Ładuje się......
Time-Lag and Cost Overrun of Infrastructural Investment with Special Reference to Power Projects in Kerala
1. autor: | Baby Thomas |
---|---|
Format: | Printed Book |
Język: | English |
Wydane: |
Kochi
Dept of applied Economics, CUSAT
1994
|
Hasła przedmiotowe: |
Podobne zapisy
-
Time-lag and cost overrun of infrastructural investments with special references to projects in Kerala
od: Baby Thomas,Guide- D.Rajasenan
Wydane: (1994) -
Time and cost overruns of industrial projects in Kerala
od: Suresh, V. N.
Wydane: (2000) -
Time and cost overruns of industrial projects in kerala.
od: Suresh, V.N
Wydane: (2000) -
Project cost control for managers: An inside track to eliminating cost overruns
od: Tompkins, Bill G, et.al
Wydane: (1991) -
FACTORS INFLUENCING TIME AND COST OVERRUNS ON CONSTRUCTION PROJECTS IN SOUTHERN PART OF INDIA
od: S. Binil Sundar
Wydane: (2015)