Baby Thomas. (1994). Time-Lag and Cost Overrun of Infrastructural Investment with Special Reference to Power Projects in Kerala. Dept of applied Economics, CUSAT.
استشهاد بنمط شيكاغوBaby Thomas. Time-Lag and Cost Overrun of Infrastructural Investment with Special Reference to Power Projects in Kerala. Kochi: Dept of applied Economics, CUSAT, 1994.
MLA استشهادBaby Thomas. Time-Lag and Cost Overrun of Infrastructural Investment with Special Reference to Power Projects in Kerala. Dept of applied Economics, CUSAT, 1994.
تحذير: قد لا تكون هذه الاستشهادات دائما دقيقة بنسبة 100%.