|
|
|
|
| LEADER |
00706nam a22001697a 4500 |
| 005 |
20151215125301.0 |
| 008 |
091120t xxu||||| |||| 00| 0 eng d |
| 082 |
|
|
|a 658.403 2
|b OBR
|
| 100 |
|
|
|a O'Brien, James J.
|9 9107
|
| 245 |
|
|
|a CPM in construction management
|b scheduling by the critical path mathod
|
| 300 |
|
|
|a ix, 254p.
|
| 653 |
|
|
|a Critical path method
|a PERT
|a CPM
|
| 942 |
|
|
|c BK
|6 _
|
| 260 |
|
|
|a New York
|b McGraw Hill
|c 1965
|
| 999 |
|
|
|c 100947
|d 100947
|
| 952 |
|
|
|0 0
|1 0
|2 ddc
|4 0
|6 658403_2OBR
|7 0
|9 127291
|a SMS
|b SMS
|c GEN
|d 2009-11-20
|o 658.403 2 OBR
|p SMS001645
|r 2009-11-20
|w 2009-11-20
|y BK
|
| 952 |
|
|
|0 0
|1 0
|2 ddc
|4 0
|6 658403_2OBR
|7 0
|9 127292
|a SMS
|b SMS
|c GEN
|d 2009-11-20
|o 658.403 2 OBR
|p SMS007930
|r 2009-11-20
|w 2009-11-20
|y BK
|